The Ministry of the Interior announced that eviction operations at the via Chiesa Rossa settlement took place in Milan on 23 November 2026. The measure is part of the phase-out plan launched by the municipal administration in 2024, made necessary by critical issues relating to urban safety, sanitary conditions, and degradation. Technical surveys also detected soil contamination requiring urgent remediation interventions.

The planning of the activities was coordinated by the Milan prefecture through the Provincial Committee for Public Order and Security and dedicated operational working groups. Action on the ground was preceded by an accompaniment process managed by the municipality, aimed at assigning housing solutions and reception measures for vulnerable individuals.

A total of 326 operators from the Police Forces, Local Police, and Fire Brigade took part in the intervention. The operations also involved the cooperation of personnel from the Health Protection Agency (ATS), Unareti, the Regional Emergency Urgency Agency (AREU), and AMSA. The thirty-four dwellings present were cleared without any tensions or disturbances.

With the removal operations completed, the city administration ordered the closure of access points to prevent future illegal occupations. The plan will now proceed with the removal of structures, area cleaning, and soil decontamination to return the space to the community.